Effolderbacher tunnel

Underground Mining Traffic tunnel construction

Project data

Country
Germany
Client
DB Netz AG
Building Method
konventioneller Vortrieb
Order sum
3.4 million EUR
Period of implementation
January 2012 - January 2013
Contact

Sekretariat Untertagebau
+43 5556 7181-817
E-Mail


The Effolderbacher tunnel is a twin-track railway tunnel with a total length of 673 m. The structure has a single railway track with a road for wheeled vehicles.

The upgrade includes the following steps: renewal of the inner shell, repointing of the brickwork, repair and renewal of the drainage system, upgrade of the north + south portal walls, a new escape and rescue route (depending on the existing length) and a new channel for cables.

back to overview