Rodundwerk II inlet tunnel

Underground Mining Power station construction

Inlet tunnel

Project data

Country
Austria
Client
Vorarlberger Illwerke AG
Building Method
conventional tunnelling
Order sum
1.0 million EUR
Period of implementation
January 2011 - January 2011
Contact

Sekretariat Untertagebau
+43 5556 7181-817
E-Mail


VIW AG planned to create a further hydraulic connection from the Partenen area to Latschau. For this headrace tunnel, an outlet structure was envisaged for basin 2 of the Latschau reservoir. A tunnel section of about 40 m in length was excavated to ensure that any shutdown of the Latschau basin for the subsequent connection of the outlet structure would be as brief as possible.