Hotel Post, Lech

Building Construction Tourist buildings

Project data

Country
Austria
Client
Hotel Gasthof "Post" GmbH & Co KG
Order sum
-
Period of implementation
March 2010 - August 2010
Contact

Sekretariat Hochbau
+43 5556 7181-587
E-Mail


Extension work and new staff building, a new spa area including indoor pool, an additional wing of bedrooms and a new kitchen.

Two supply tunnels were driven under the existing hotel using conventional methods after demolition and underpinning of the existing structures. Immediately thereafter, a total of six floors in solid construction were built from the lowest level. The construction site was handed over on schedule despite difficult and, in some cases, unforeseeable conditions.