Paierdorf exploration shaft

Underground Mining Caverns & shafts

Project data

Country
Austria
Client
ÖBB Infrastruktur AG
Order sum
2.5 Mio EUR
Period of implementation
December 2002 - December 2003
Contact

Sekretariat Untertagebau
+43 5556 7181-817
E-Mail


JÄGER carried out the construction work for the construction of the exploration shaft in Paierdorf for ÖBB-Infrastruktur Bau AG, part of the exploration programme for the Koralm tunnel. The contract was for a vertical shaft, which was driven into loose material to a depth of 120 m and with a diameter of 9.7 m. The shaft had to pass through both quaternary and tertiary layers, which consisted of a mixture of silt, sand and gravel. The shaft was sunk with the aid of a specially designed sinking shield, secured by rings made of precast concrete segments.