Vorarlberg Museum, Bregenz

Building Construction General structural engineering

Project data

Country
Client
Agency of the Vorarlberg state government
Order sum
5.58 Mio EUR (as part of a consortium)
Period of implementation
September 2010 - October 2011
Contact

Sekretariat Hochbau
+43 5556 7181-587
E-Mail


JÄGER built the state museum in Bregenz as a member of a consortium. Demolishing the upper floors while preserving the lower façade was in itself a special challenge. This was followed swiftly by the simultaneous construction of a new annex and comprehensive conversion of the existing building. The greatest challenges were presented by the architects’ design for the façade of the new building, which, after complete construction of the load-bearing inner shell, was precast in situ over the entire 23-m façade height.

back to overview